Smoke drifting through a sunlit pine forest

Bend project guide · Exterior

Wildfire Home Hardening in Bend, Oregon

Most homes lost in wildfires are ignited by embers, not a wall of flame. Here is how Bend homeowners prioritize retrofits, from a free weekend of cleanup to new siding, and what the city's 2026 wildfire building code means for you.

Bend R327 code: effective May 15, 2026Retrofits: voluntary for existing homesUpdated October 19, 2026

Start here

Where do you want to start?

Bend Local Services FinderWant a few names for this exact job?

Tell us what you are planning and we'll point you to up to three Bend-area pros who actually take this kind of project.

Get local quotes
Made for BendLocal research. Useful context. No fluff.
Part of our Bend general contractors guideUpdated October 19, 2026

What Bend's 2026 wildfire code does (and does not) cover

In April 2026, the Bend City Council adopted the state's residential wildfire mitigation building code, known as R327, citywide. The key facts from the City:

  • Effective date: residential building permit applications submitted on or after May 15, 2026.
  • Applies to: newly constructed homes and newly constructed accessory structures (for example, a new detached ADU).
  • Does not apply to: existing homes, additions, renovations, apartments or commercial buildings.
  • Where: the entire city, which Bend already designates as a Wildfire Hazard Zone.
  • Defensible space (vegetation) rules are being considered by the City separately from the building code.

Outside city limits, Deschutes County made R327 mandatory for new dwellings and new accessory structures in unincorporated areas starting April 1, 2026, and the county accepts products from the CAL FIRE listed-products handbook when they are specified on the drawings.

Even though existing homes are not required to comply, R327 is a useful checklist for retrofits: it lays out the same ember-entry points this guide covers.

How homes actually catch fire

Research on lost homes consistently points to embers: burning bits carried far ahead of a fire that land in gutters full of needles, blow through attic vents, collect against walls and decks, and ignite whatever is there. Bend's ponderosa pines, juniper, bitterbrush and dry summers create a lot of ember fuel. The goal of hardening is to give embers nowhere to start a fire on or in the house.

Retrofit priorities, from free to major

Tier 1: low cost, do this first

  • Clear the 0–5 foot zone around the house and deck: swap bark mulch for gravel or rock, remove juniper and other flammable shrubs next to walls, and move firewood and stored items away.
  • Clean roof and gutters of pine needles, especially before and during fire season. Our gutter guide lists local crews.
  • Clear under decks and stairs of anything stored or blown in.
  • Trim trees back from the roof and chimney. See our tree services guide.
  • Replace a wood fence connection: the last few feet of a wood fence where it meets the house can carry fire to the wall. A metal gate or section fixes it.

Tier 2: moderate cost, often a day or two of contractor work

  • Ember-resistant vents for attic, soffit, gable and crawl space openings.
  • Metal gutter guards and noncombustible gutters.
  • Roof edge details: sealing gaps at the ridge and eaves, and metal drip edge.
  • A noncombustible strip at the base of walls: siding replaced with a noncombustible material for the bottom several inches, plus gravel at grade.
  • Enclosing open eaves with noncombustible soffit material.
  • Screening or enclosing under decks with fine metal mesh or solid noncombustible skirting.

Tier 3: major projects, best done when replacing anyway

  • Class A roof. If your roof is due, choose a Class A assembly. Wood shake roofs are the biggest single risk. See our roofing guide.
  • Noncombustible or ignition-resistant siding, like fiber cement. See our siding guide.
  • Dual-pane windows with tempered glass, which hold up much better to heat. See our windows guide.
  • Deck rebuilds with fire-rated decking and noncombustible framing near the house. See our deck builders guide.
Bundle the work. When siding comes off, vents, eaves, windows and the base-of-wall detail can all be upgraded at the same time for far less than doing them separately later.

If you are remodeling or building in 2026 and beyond

  • New home or new accessory building: R327 applies. Ask your builder which details and listed products they use and how it affects the budget.
  • Addition or remodel: R327 is not required, but adding ember-resistant vents, noncombustible siding and tempered glass to the new work usually costs little extra.
  • Landscaping: plan the 0–5 foot zone with rock, hardscape and low, well-watered plants. Our landscaping guide lists local designers.
  • Covered patios and pergolas: material choices matter here too. See our patio covers guide.
Official sources: the City of Bend's announcement of the R327 adoption, Deschutes County's “Fire Hardening Requirements (R327)” page, and the Oregon Building Codes Division wildfire hazard mitigation page. Rules change; check them before you build.

Who to call

Bend contractors for hardening projects

Listed in no particular order. Hardening is usually a set of smaller jobs across several trades: roofing, gutters, siding, decks and landscaping. These contractors can take on the building-envelope pieces.

Design-build + restorationBend and Central Oregon

Sierra James Construction

Why for this project: Restoration background that includes fire and smoke damage, plus design-build remodeling, so they understand both the risk and the retrofit.

Phone
541-306-3775
Read our full take
Homes, ADUs & middle housingBend and Central Oregon

Arbor Builders

Why for this project: Active new-construction builder in Central Oregon, a good source for how R327 details are being built locally if you are building new.

Phone
541-323-4852
Read our full take
Decks & exterior projectsBend

Webfoot Home Improvements

Why for this project: Deck and exterior work, useful for replacing combustible deck boards, enclosing under-deck areas and swapping railings.

Phone
541-390-0590
Read our full take
Decks & coversBend

Bend Custom Decks

Why for this project: Deck specialist; ask about fire-rated decking options and how they handle the area under and around the deck.

Phone
541-977-1166
Read our full take

FAQ

Common questions

Does Bend require me to retrofit my existing home for wildfire?

No. Bend's adoption of the state R327 wildfire standards applies to newly built homes and newly built accessory structures with permit applications submitted on or after May 15, 2026. It does not apply to existing homes, additions or renovations. Retrofitting is voluntary, but strongly encouraged.

Is all of Bend in a wildfire hazard zone?

Yes. The City of Bend has designated the entire city a Wildfire Hazard Zone, and the R327 ordinance applies citywide. Properties outside city limits follow Deschutes County rules, where R327 became mandatory for new dwellings and new accessory structures on April 1, 2026.

What is the single most effective thing I can do?

Clear the first five feet around your home of anything that can burn: bark mulch, juniper and other flammable shrubs, firewood, and stored items. Then clean roofs and gutters of needles. These cost little and address where embers most often start fires.

What are ember-resistant vents?

Vents with fine mesh (commonly 1/8 inch or smaller) or baffle designs that limit embers entering attics and crawl spaces. Some products are tested and listed for wildfire use. Replacing attic, soffit and crawl space vents is a common, moderate-cost retrofit.

Will hardening lower my insurance cost?

It can help with some insurers, but practices vary and change. Document the work you do with photos and receipts and ask your agent what mitigation they recognize.

More Bend project guides

Planning something else?

Every guide is part of our Bend general contractors guide.

Keep this guide useful

Did a Bend pro do this well for you?

Tell us who did your project and how it went. We check CCB licenses, reviews and project focus before adding anyone.